Our Operations / Our facilities
Kumasi, Ghana
Kumasi Bottling Facility
An ultra-modern facility with two high-speed lines commissioned in 2022.
- Bottles per hour (line 1)
- 80,000
- Bottles per hour (line 2)
- 65,000
About the site
After a decade of beverage manufacturing in Ghana, Twellium opened an ultra-modern facility in Kumasi. Two production lines were commissioned in 2022 with capacities of 80,000 and 65,000 bottles per hour.
On site
- Two complete PET lines for still and carbonated drinks
- Built with Sidel and commissioned in 2022
- 145,000 bottles per hour combined capacity