Skip to content
Our Operations / Our facilities

Kumasi, Ghana

Kumasi Bottling Facility

An ultra-modern facility with two high-speed lines commissioned in 2022.

Bottles per hour (line 1)
80,000
Bottles per hour (line 2)
65,000

About the site

After a decade of beverage manufacturing in Ghana, Twellium opened an ultra-modern facility in Kumasi. Two production lines were commissioned in 2022 with capacities of 80,000 and 65,000 bottles per hour.

On site

  • Two complete PET lines for still and carbonated drinks
  • Built with Sidel and commissioned in 2022
  • 145,000 bottles per hour combined capacity

Our other sites

Under construction

Something fresh is on the way

We're putting the finishing touches on this page. Please check back soon. In the meantime, explore our products or get in touch with our team.

Contact us